17 machines

Fig. 013 industries
Steam Roaster
Roasts and dries rice powder, rava, flour and ayurvedic powders in a steam-jacketed pan, so heat comes from a boiler and no flame touches the batch.
- Capacity Range
- 50KG - 1500KG
- Power Requirements
- 440V Three Phase AC

Fig. 02
Blender
- Capacity Range
- 25KG - 1500KG
- Power Requirements
- 440V Three Phase AC

Fig. 03
Electric Roaster
- Capacity Range
- 15KG - 500KG
- Power Requirements
- 440V Three Phase AC

Fig. 04
Electric Tray Dryer
- Capacity Range
- 3 Tray - 100 Tray
- Power Requirements
- 440V Three Phase AC

Fig. 05
Vibro Sifter
- Capacity Range
- 24
- Power Requirements
- 440V Three Phase AC

Fig. 06
Double Screw Juice Expeller
- Capacity Range
- Depends on Material
- Power Requirements
- 440V Three Phase AC

Fig. 07
Fruit Pulper
- Capacity Range
- Depends on Material
- Power Requirements
- 440V Three Phase AC
Fig. 08
Fruit Mill
- Capacity Range
- Depends on Material
- Power Requirements
- 440V Three Phase AC

Fig. 09
Rice Washing
- Capacity Range
- 25KG - 600KG
- Power Requirements
- 440V Three Phase AC

Fig. 10
Rice Steaming
- Capacity Range
- 15KG - 600KG
- Power Requirements
- 440V Three Phase AC

Fig. 11
Hammer Mill With Elevator
- Capacity Range
- 2,500KG/hr
- Power Requirements
- 440V Three Phase AC
.jpg?tr=w-3840,q-75,f-auto)
Fig. 12
Uruli Roaster (LPG)
- Capacity Range
- 10KG - 175KG
- Power Requirements
- 440V Three Phase AC
Fig. 13
Drum Roaster (Chilly)
- Capacity Range
- 5KG - 100KG
- Power Requirements
- 440V Three Phase AC
Fig. 14
Drum Roaster (Coffee & Grains)
- Capacity Range
- 5KG - 100KG
- Power Requirements
- 440V Three Phase AC

Fig. 15
Firewood Roaster
- Capacity Range
- 20KG - 175KG
- Power Requirements
- 440V Three Phase AC
Fig. 16
Sifter
- Capacity Range
- SR 200 - SR 1500
- Power Requirements
- 440V Three Phase AC

Fig. 17
Pulveriser
- Capacity Range
- 5KG Onwards
- Power Requirements
- 440V Three Phase AC
Custom-Built Systems
Can't Find What You Need?
Our engineers design and build processing systems to your specification, from the first drawing to commissioning.
Talk To An Engineer